SHELL CARDAMOM PIPELINE INITIATION

The Noble Jim Thompson MODU provided drilling and completion services for the Shell Cardamom development. The rig presented a number of unique challenges including a relatively close proximity to the Auger TLP..

SAIPEM BIGFOOT PIPELINE INITIATION PILE

The Bigfoot TLP (Chevron) export lines were installed by Saipem using the newly constructed Castorone pipelay vessel. The project required the first end SCR installation to start in the deepwater location and..

WOODSIDE – MOORING QRA TOOL

Woodside contracted Delmar Systems to develop a mooring quantitative risk assessment (QRA) tool capable of assessing possible threats from mooring failure.

Permanent support for pipeline integrity

Delmar Systems was awarded the engineering, procurement, and construction (EPC) contract for the detailed design and fabrication of five (5) subsea suction pile foundations in the Gulf of Mexico to support an..

LLOG – WHO DAT

Delmar Systems has completed subsea tree installations using the patented Heave Compensated Landing System (HCLS) for multiple LLOG Who Dat drill centers. Delmar Systems' experience with a variety of water depths and..

SHELL APPOMATTOX PERMANENT FACILITY

Delmar provided mooring design engineering services for Shell’s Appomattox permanent facility in the Gulf of Mexico. This included global mooring analysis verification using Delmar’s non- linear polyester stiffness methodology and in-house mooring..

ANADARKO RED HAWK

Anadarko elected to decommission the Red Hawk cell spar production platform. The potential future sale and relocation of the platform required the abandonment of the existing steel catenary risers from their hang..

LLOG OPTI-EX WHO DAT

Delmar Systems was awarded the engineering, procurement, construction, and installation (EPCI) contract for the mooring and installation of the OPTI-EX floating production facility, which was installed in the Mississippi Canyon area of..