Shell expanded the use of the Heave Compensated Landing System (HCLS) from the Gulf of Mexico to the Parque das Conchas (BC-10) development off the east coast of Brazil.
For mooring the semi-submersible rig Transocean Amirante in 2800’ (853m) water depth offshore Egypt, Delmar Systems formulated procedures and provided personnel.
Enterprise contracted Delmar Services to provide QA/QC engineering of the mooring system design and mooring as well as SCR installation activities. Delmar Services was the point contact for coordination of the design..
During the development of the Bijupira-Salema production field in the Campos Basin, Brazil, the installation of the steel catenary riser anchor piles fell in between the several installation contractors’ contracts.
At the request of the drilling contractor Delmar Systems developed a procedure for mooring the semi-submersible drilling rig Jack Bates on a location West of the Shetland Islands in 5300’ water depth.