EXXONMOBIL KARA SEA ARCTIC MOORING
Delmar Systems was contracted to provide mooring services for the West Alpha on ExxonMobil’s University location in the Kara Sea. Operational mooring procedures for the preset mooring installation and rig connection were developed by Delmar Systems.
The installation engineering and mooring line configuration were provided by Delmar Systems, including the use of a mooring line quick release device.
- Preset mooring system
- Mooring quick release
- Arctic mooring
FEATURES
Year: 2014
Location: Russia, Kara Sea
Water Depth: 262ft / 80m