ANADARKO RED HAWK

19 March 2012

Anadarko elected to decommission the Red Hawk cell spar production platform. The potential future sale and relocation of the platform required the abandonment of the existing steel catenary risers from their hang off porches on the platform.

Delmar Systems engineered the specialized tooling and operational steps to recover and abandon the infield flowlines and control umbilical to the seabed. The removal of the SCRs from the platform significantly improved the remaining platform life, allowing the reuse of the structure on another field development.

  • Decommissioning
  • Production riser support

FEATURES

Year: 2012
Location: Gulf of Mexico GB 877
Water Depth: 5,300ft / 1,615m