As of June 1, Vryhof will no longer support the Internet Explorer 11 browser. For the best experience, please switch to a modern browser

News

ANADARKO RED HAWK

Anadarko elected to decommission the Red Hawk cell spar production platform. The potential future sale and relocation of the platform required the abandonment of the existing steel catenary risers from their hang..

LLOG OPTI-EX WHO DAT

Delmar Systems was awarded the engineering, procurement, construction, and installation (EPCI) contract for the mooring and installation of the OPTI-EX floating production facility, which was installed in the Mississippi Canyon area of..

ENTERPRISE INDEPENDENCE HUB PRODUCTION FACILITY

Enterprise contracted Delmar Services to provide QA/QC engineering of the mooring system design and mooring as well as SCR installation activities. Delmar Services was the point contact for coordination of the design..

Mooring procedures for Jack Bates

At the request of the drilling contractor Delmar Systems developed a procedure for mooring the semi-submersible drilling rig Jack Bates on a location West of the Shetland Islands in 5300’ water depth.