Brazil represents one of the most challenging deepwater projects in the region.

Shell – BC10 Pipeline Holdback

Shell – BC10 Pipeline Holdback

Parque das Conchas (BC-10) lies in approximately 1,780 meters (5,840 feet) of water. Shell has a 50% interest in the project and is the operator. This location, off the coast of Brazil, represents one of the most challenging deepwater projects in the region. The unexpected thermal movements of an infield
flowline required the installation of an additional restraint to limit the PLET movement and jumper loads. Due to a solid reputation innovating unique solutions
for challenging situations, Delmar was asked to provide the structural foundation for the PLET holdback and permanent installation support for the suction pile provided. Using site-specific engineering and equipment the pile was permanently connected to the PLET.

  • Year

    2014
  • Location

    Brazil
  • Water Depth

    5,840ft/1,780m