MODU Jack Bates

More Detailed Scope of Work:

Delmar worked in the interest of the drilling contractor to develop procedures for mooring the Jack Bates on a location West of the Shetland Islands in 5300’ water depth. The procedure was developed with respect to high current loads, load sharing of the mooring system between the AHTS vessels, and rig mooring equipment as well as environmental challenges of the location.  As the Operator also had a mooring contractor on hire for this project, Delmar served as the QA/QC party to align those procedures with the rig’s operational guidelines. Mooring Coordinators were provided on the rig as well as Mooring Superintendents on the AHTS vessels.