Transocean Amirante

More Detailed Scope of Work:

Delmar formulated procedures and provided personnel for mooring the Transocean Amirante offshore Egypt in service to the drilling contractor.  The rig was moored at the “Simian Dh” location in 2800’ water depth using an eight-line wire rope insert strategy.  A multi-vessel installation and recovery procedure was directed by Delmar using local vessels to execute an operation that had been performed in numerous USGOM projects but not internationally.  Introducing the vessels’ personnel to the use of j-lock chasers to insert the wire extensions was received well and operational efficiencies experienced during prior projects with the same rig were replicated.