INPEX Ichthys Drilling Campaign

More Detailed Scope of Work:

Delmar Systems, Inc. designed and installed mooring systems using the RAR Plus, an exceptionally reliable acoustic release with mechanical backup. This allowed the Maersk Deliverer the flexibility to obtain NOPSEMA approval to moor year-round and evade cyclonic conditions, just as the rig would with DP only. 

Departing a location can be done within an hour, as opposed to days with a standard mooring disconnect. This saves the operators millions on spread cost, even without unforeseen delays during disconnection operations in addition to the cyclonic event risk mitigation